Dental Biomaterials Goods-In Inspection Checklist

A goods-in inspection checklist for distributors receiving dental bone grafts and collagen membranes: documents, packaging, labels, lots, dates and quarantine.

A goods-in inspection checks that a shipment of dental biomaterials is what was ordered, arrived undamaged and carries complete, correct labelling before it enters saleable stock. For XENOBONE and COLL-OS, that means matching product, format and quantity to the order, inspecting cartons and sterile packs, verifying lot numbers, dates and CE marking, and quarantining anything doubtful.

Key takeaways

  • Check every shipment against the order and the delivery documents before booking it in.
  • Inspect outer cartons and sterile packs for damage, moisture and broken seals.
  • Verify labels, lot numbers, use-by dates and CE marking.
  • Quarantine anything doubtful and report it to the manufacturer.

This checklist is for distributor warehouse teams. It reflects the verification duties distributors have under the EU Medical Device Regulation and good practice under ISO 13485 quality systems. Product details are on the XENOBONE and COLL-OS pages.

Why inspect at goods-in?

Goods-in is the last point at which a problem can be caught before it reaches a clinic. A crushed carton, a damaged sterile pack or a wrong format found in the warehouse costs little. The same problem found in a surgery costs time, trust and sometimes a postponed procedure.

Inspection is also a legal duty. Under the MDR, distributors verify that devices carry the CE marking, are accompanied by the required information and are labelled correctly before making them available. Our article on MDR compliance for distributors explains the full set of duties.

What should be checked against the documents?

Start with paperwork. Check it before opening any carton, so discrepancies are noted against the right shipment:

  • Delivery note and invoice match the purchase order.
  • Product codes, formats and quantities match.
  • Lot numbers on the delivery documents match the packs.
  • Any certificates or declarations expected with the shipment are present.

For XENOBONE, check the particle size of every line: 0.7–1.5 mm, 2–3 mm or 4–5 mm. For COLL-OS, check the membrane size: 1.25 × 2.5, 1.5 × 2, 2 × 3 or 2.5 × 2.5 cm. Formats in similar packaging are the most common source of mismatches.

How should packaging be inspected?

Inspect outer cartons first, then a representative sample of inner packs, or all of them for small shipments:

CheckLook for
Outer cartonsCrushing, punctures, water damage, opened tape
Inner packsTears, punctures, broken or incomplete seals
Sterile barrierIntact, with no signs of opening
MoistureStains, warping, condensation
LabelsPresent, legible, firmly attached

Any pack with a compromised sterile barrier is not saleable. Set it aside, photograph it and report it.

Photograph damaged cartons before opening them as well. If the damage happened in transit, the photographs support a claim with the carrier, and the manufacturer can see whether its outer packaging needs attention. Note the condition on the carrier's delivery document at the time of receipt, since many carriers accept claims only when damage was recorded on delivery.

Which label elements must be verified?

Each pack should carry, at minimum, the elements below. Symbols follow ISO 15223-1:

  • Product name and format.
  • Lot number.
  • Use-by date.
  • Sterilisation symbol: COLL-OS shows the irradiation symbol; each product shows its own.
  • Single-use symbol.
  • Manufacturer name and address.
  • CE marking.
  • UDI, where applicable.

Keep a reference photograph of a correct label for each product and format. Staff can compare quickly, and a label that differs is easy to spot. Update the reference set whenever the manufacturer announces a labelling change, and remove old images so nobody compares against an outdated label.

How should use-by dates be checked?

Check that use-by dates are in line with what was agreed and leave enough time to sell the stock. Record the dates by lot so that stock rotation works: first expiry, first out. Units with short remaining dates should be flagged for priority sale or discussed with the manufacturer before they are booked in. Record the decision and the reason in the goods-in log.

What happens to stock that fails inspection?

Anything that fails inspection goes into a clearly marked quarantine area, physically separated from saleable stock. Record:

  • What was found, with photographs.
  • Product, format, lot and quantity.
  • Date and name of the inspector.

Report it to the manufacturer the same day. Do not sell, repackage or relabel quarantined stock. Wait for the manufacturer's instructions on return, replacement or disposal. Review the quarantine area weekly so nothing is forgotten there.

How should the inspection be recorded?

Record every inspection, whether the shipment passed or not. A simple goods-in log with date, delivery reference, products, lots, quantities, result and inspector is enough. The log shows an auditor or a customer that inspections happen, and it helps trace any later question about a lot back to the day it arrived.

Our article on scalable supply chain solutions covers how goods-in fits into wider warehouse processes.

How can errors at goods-in be reduced?

Most goods-in errors come from rushing and from similar-looking packs. Practical measures:

  • Inspect shipments in a dedicated area, not on the warehouse floor.
  • Scan barcodes where possible, rather than typing lot numbers.
  • Store each format in its own labelled location immediately after booking in.
  • Train every person who receives stock, and refresh the training when products or labels change.

Talk to a DESU product specialist

To report a goods-in issue with XENOBONE or COLL-OS, or to request reference label images, write to sales@desu.tr, use the contact page, or request a quote.

Frequently asked questions

Must every single pack be inspected?

Outer cartons should always be inspected. For inner packs, a representative sample is acceptable for large shipments if the method is defined; small shipments are often checked in full.

Can a pack with a damaged outer box but intact inner pack be sold?

If the sterile barrier and label are intact, it may be acceptable, but record the damage and follow your quality procedure. When in doubt, quarantine and ask the manufacturer.

Who should perform goods-in inspection?

Trained warehouse staff working to a written procedure. The person should know the products, formats and label symbols.

How quickly should goods-in inspection be done after delivery?

As soon as practical, ideally on the day of delivery. Delays leave uninspected stock in the warehouse and can make carrier claims harder if damage is found later.

Related standards

  • Regulation (EU) 2017/745 on medical devices (MDR)
  • ISO 13485: Medical devices — Quality management systems
  • ISO 15223-1: Medical devices — Symbols to be used with information to be supplied by the manufacturer